Its reinforced, takes 2" steel pipes each side to tension it and is secured with webbing every 8 feet.
We hauled it up and over with 3 800 kg winches.
It was supposed to be an 8 man job but I managed this on my own with the boys doing the winch control.
1 comments:
Jaysus man,
That's some hardship to have to put up with because of the weather.
Hope that things are back on track (if not schedule) for you now.
John.