1/3/10

Clonmel Covers made this new roof for the boat.

Its reinforced, takes 2" steel pipes each side to tension it and is secured with webbing every 8 feet.

We hauled it up and over with 3 800 kg winches.



It was supposed to be an 8 man job but I managed this on my own with the boys doing the winch control.












Soon I will have the gables on and get new side plascic and attach it in a better way.
Anybody going the the Excel Boat show London??
I'll be there 11th and 12th.

1 comments:

John said...

Jaysus man,
That's some hardship to have to put up with because of the weather.
Hope that things are back on track (if not schedule) for you now.

John.